Методы производства работ по прокладке подземных трубопроводов открытым способом в стесненных условиях

Показать сокращенную информацию

dc.contributor.author Опанасюк, И. Л.
dc.contributor.author Данилов, С. В.
dc.contributor.author Opanasiuk, I. L.
dc.contributor.author Danilov, S. V.
dc.date.accessioned 2022-02-25T11:56:43Z
dc.date.available 2022-02-25T11:56:43Z
dc.date.issued 2021
dc.identifier.citation Опанасюк, И. Л. Методы производства работ по прокладке подземных трубопроводов открытым способом в стесненных условиях / И. Л. Опанасюк, С. В. Данилов // Веснік Гродзенскага дзяржаўнага ўніверсітэта імя Янкі Купалы. Серыя 6. Тэхніка. – 2021. – Том 11, № 2. – С. 122–131. ru_RU
dc.identifier.uri http://e.biblio.bru.by/handle/1212121212/19107
dc.description.abstract Во введении рассмотрен накопленный в практике опыт реконструкции внутриплощадочных сетей промышленных предприятий, который показывает, что реализация проектных решений в реальных производственных условиях, обусловленных стесненностью производства работ, приводит к необоснованно завышенным объемам земляных и монтажных работ. Прокладка трасс подземных трубопроводов требует комплексного подхода к выбору обоснованных рациональных организационнотехнологических решений как на стадии проектирования, так и в процессе выполнения земляных и монтажных работ. Описаны особенности производства работ по прокладке подземных сетей водопровода и канализации в условиях реконструкции промышленных предприятий, которые подразделяются на четыре основные группы. В основной части приведены результаты организационно-технологического обоснования решений с использованием для этих целей различных параметров, обуславливающих стесненные условия производства работ. Выполнен анализ возможных объемно-планировочных и технологических параметров и определено, что в стесненных условиях при прокладке подземных трубопроводов открытым способом ширина зоны производства работ является основным линейным параметром, определяющим организационно-технологические решения и методы производства работ. В заключении констатируется, что стесненность по ширине фронта работ характеризуется в нестесненных, мало стесненных и стесненных условиях работ возможностью монтажа подземных трубопроводов с помощью автомобильных кранов и тракторных кранов-трубоукладчиков, расположенных на одной из берм траншеи. В особо стесненных условиях монтаж трубопроводов производится с помощью экскаваторов с гидравлическим приводом. Также в зависимости от ширины фронта работ по прокладке трубопроводов открытым способом рекомендованы варианты формирования откосов и отвалов земляных траншей. The experience gained in practice in the reconstruction of on-site networks of industrial enterprises is considered in the introduction. This experience shows the implementation of design solutions in real production conditions, due to the constraint construction operations, so it leads to unreasonably overestimated volumes of excavation and installation works. Routing of underground pipelines requires a comprehensive approach for the selection of reasonable rational organizational and technological solutions, both at the design stage and in the process of performing excavation and installation works. The features of the underground laying of water and sewerage pipelines in the reconstruction conditions of industrial enterprises (which are divided into four main groups) are described. The main part presents the results of the organizational and technological justification of decisions using various parameters for these purposes, due to determine the constraint conditions of construction operations The analysis of possible space-and-planning and technological parameters was carried out. It was also determined that the working space width is the main linear parameter that defines the organizational and technological solutions and methods of construction operations in underground pipelining in constraint conditions by an open way. It is stated in conclusion that the constraint along the work front width is characterized in unconstrained, slightly constrained, and constrained working conditions by the possibility of installing underground pipelines using truck cranes and tractor pipelining cranes located on one of the trench berm. The pipelining is carried out using excavators with a hydraulic drive in particularly constrained conditions. In addition, depending on the width of the work front on pipelining by an open way, options for the formation of slopes and dumps of trenches are recommended. ru_RU
dc.language.iso ru ru_RU
dc.subject метод ru_RU
dc.subject открытый способ ru_RU
dc.subject зона ru_RU
dc.subject стесненность ru_RU
dc.subject условия ru_RU
dc.subject трубопровод ru_RU
dc.subject method ru_RU
dc.subject open way ru_RU
dc.subject working space ru_RU
dc.subject constraint ru_RU
dc.subject conditions ru_RU
dc.subject pipeline ru_RU
dc.subject Публикации кафедры "Промышленное и гражданское строительство" ru_RU
dc.title Методы производства работ по прокладке подземных трубопроводов открытым способом в стесненных условиях ru_RU
dc.title.alternative Production methods of construction operations on underground pipelining in constraint conditions by an open way ru_RU
dc.type Article ru_RU
dc.identifier.udc 621.543.2.004


Файлы в этом документе

Данный элемент включен в следующие коллекции

Показать сокращенную информацию